The frame was handbuilt by Tap fabrications the dimensions are 8 up and 6 out with 408 of rake.
It has a ten over hydraulic front end.
Here is a list of parts made by TaP Fab: Pipes Frame Headlight Mount Foward Controls Petcock port in tank Intake Breather Motor Mounts Rear Brake Mounts Battery Box Fender mounts and Strut Shifter and linkage Coil Mount. Seat Pan (Which is out for upholstery.) Tag and Tail Light Mount
TaP Fab also wired and painted the bike.
Blacksmith Billy Installed the gas gauge in the side of the coffin tank.
This page has been viewed 814 times
by 753 visitors.
(Not including visits today. Stats updated nightly.)
we are a new business and we are just doing this on the side, low budget. We work out of a personal garage with no overhead to keep costs low, and don't even have a business phone. If you want something just emial me at prodigi87@yahoo.com